wp-mail-logging
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/mexcom/public_html/wp-includes/functions.php on line 6114ninja-forms
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/mexcom/public_html/wp-includes/functions.php on line 611425th July 2016 – Implementation of contra flow at MEX Highway will continue due to the positive impact on the traffic flow on the MEX Highway<\/p>\n
Since its implementation on July 25, 2016, it has been able to disperse the congestion along the 4km to 2km at the main lane MEX only on major routes. It also contributes to shorter journey times, which is 10 minutes faster than usual. The average daily number of vehicles using the route counter is for 2,800 vehicles from 6.30 am until 9.00 am except Saturdays, Sundays and public holidays.<\/p>\n
The implementation of the contra flow is essentially an effort to increase the flow of traffic accommodate increased traffic flow of Putrajaya, Cyberjaya and Puchong in Kuala Lumpur.
\nUsers are advised to comply with the signage placed and routed to their destinations well to avoid congestion.<\/p>\n
Get the latest information on MEX contra flow and latest traffic reports on MEX through @MEXTraffic Twitter and MEXTraffic Facebook account. Also, call us on MEXHotline at 03-83159111 for more information.<\/p>\n
For more information on the statement, kindly contact:
\nSaiful Bakhri Mohd Annuar
\nCorp. Comm. Department
\nMaju Expressway Sdn Bhd
\nTel: 03 8315 9121
\nEmel: saiful@mex.com.my
\nWebsite: www.mex.com.my<\/p>\n","protected":false},"excerpt":{"rendered":"
25th July 2016 – Implementation of contra flow at MEX Highway will continue due to the positive impact on the traffic flow on the MEX Highway Since its implementation on July 25, 2016, it has been able to disperse the congestion along the 4km to 2km at the main lane MEX only on major routes. […]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-174","post","type-post","status-publish","format-standard","hentry","category-press-release"],"acf":[],"aioseo_notices":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/posts\/174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/comments?post=174"}],"version-history":[{"count":0,"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/posts\/174\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/media?parent=174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/categories?post=174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mex.com.my\/wp-json\/wp\/v2\/tags?post=174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}